THOR FRIGG

Our team at the port of Las Palmas, at full capacity with the THOR FRIGG!
The imposing ship has made a technical stop at the shipyard and is preparing for a time in dry dock over the next two weeks.

Our operations team has been delivering spare parts and collecting all the necessary materials, ensuring that everything is ready for the start of work on the THOR FRIGG. 

All our recognition to our incredible team in Las Palmas. Their dedication and efficiency are essential in these demanding operations.